Sub-drill / ROV Pre Mobilisation Testing

ROV pre-mobilisation testing also known as a “Wet Test” is an important and comprehensive testing phase that ensures a Remotely Operated Vehicle (ROV) system is fully operational, safe and compliant being deployed to the field.

Industry Compliance

Executing pre-mobilisation testing systematically verifies compliance with IMCA R 006 and / or the operators internal standard.

 

This critical validation process successfully ensures strict alignment with recognised industry standards and global best practice before equipment deployment.

In-House Open Water Test Pit

Sub-drill’s service facility has the necessary space and specialised capabilities to safely accommodate complete ROV pre-mobilisation testing in our dedicated open water test pit.
 
A high-capacity 3 phase electrical connection is readily available on-site to directly connect the Launch and Recovery System (LARS) during these trials.
ROV in water test pit

Pre-Mobilisation Testing

Inspection / Testing – Verify the physical condition of the ROV frame and operation of manipulators, thrusters and Launch and Recovery System (LARS). 

 

Proof Load Testing of the Launch and Recovery System (LARS) using water weights as required. 

 

Communication & Electrical – Testing surface controls, power distribution, insulation resistance (Megger testing), fibre optics and telemetry links. 

 

Hydraulic System & Tooling – carry out pressure and function checks on hydraulic power units (HPU’s), live tooling and hot stab interfaces. 

 

• Camera & Sensor Calibration – Validate the operation of navigational sensors, sonar, altimeters and HD video quality. 

 

• Ballasting adjustments to provide optimal buoyancy.