Sub-drill / ROV Pre Mobilisation Testing

ROV pre-mobilisation testing also known as a “Wet Test” is an important and comprehensive testing phase that ensures a Remotely Operated Vehicle (ROV) system is fully operational, safe and compliant being deployed to the field.

Industry Compliance

Executing pre-mobilisation testing systematically verifies compliance with IMCA R 006 and / or the operators internal standard.

 

This critical validation process successfully ensures strict alignment with recognised industry standards and global best practice before equipment deployment.

In-House Open Water Test Pit

Sub-drill’s service facility has the necessary space and specialised capabilities to safely accommodate complete ROV pre-mobilisation testing in our dedicated open water test pit.
 
A high-capacity 3 phase electrical connection is readily available on-site to directly connect the Launch and Recovery System (LARS) during these trials.
ROV in water test pit

Pre-Mobilisation Testing

• Inspection / Testing – Verify the physical condition of the ROV frame and operation of manipulators, thrusters and Launch and Recovery System (LARS). 

 

• Proof Load Testing of the Launch and Recovery System (LARS) using water weights as required. 

 

• Communication & Electrical – Testing surface controls, power distribution, insulation resistance (Megger testing), fibre optics and telemetry links. 

 

• Hydraulic System & Tooling – carry out pressure and function checks on hydraulic power units (HPU’s), live tooling and hot stab interfaces. 

 

• Camera & Sensor Calibration – Validate the operation of navigational sensors, sonar, altimeters and HD video quality. 

 

• Ballasting adjustments to provide optimal buoyancy.